Fiberglass pieces are big, heavy, and hate impacts; shipping and installation are on a completely different level from vinyl and injection molding. Packing usually goes wooden crate plus custom inserts: large pieces are split into head, body, and base sections, crated separately, and locked in place with foam and EPE pearl cotton — the enemies are shaking, collision, and pressure in transit. The shipping mode depends on destination and timing: domestic trucking, ocean FCL or LCL for export, and oversized pieces sometimes need special containers or dedicated lines; freight and insurance must be factored in early, not estimated with small-parcel courier logic. On site, installation isn’t just unboxing and placing. The base must be fixed first, on level ground that can bear the load; segmented pieces are matched by serial numbers and joined, the seams filled, sanded, and spray-blended so they nearly disappear; large pieces need rigging or multi-person lifting, and fixing bolts, embedded plates, and internal supports must be built into the structure in advance or it won’t stand stable. After installation, check the seams, paint, center of gravity, and wind resistance (for outdoor pieces); any damage gets repaired on site. That’s why shipping and installation often account for a substantial share of the total project cost.